Portion of Section 2102 . Manhole Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) 5 ft. = Depth of Backfill below top 5 feet 1) 9 ft. 5 ft. = 4 ft. 2) 4 ft. x 3 lifts/ft. The diameter of the mandrel at any point shall not be less than the allowable percent deflection of the certified actual mean diameter of the pipe or culvert being tested. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with, Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. 14) What is the maximum deflection allowed for flexible pipe? That list has been provided below: To learn about CHANGES up to 2018, please review the following: If youhave more in-depth questions, contact the Materials Certification Schools team: Email:MaterialsCertification@vdot.virginia.gov, Phone: J. R. Noble 804-731-9457 or Scott Manning 804-229-5118. In a rigid pipe, this zone has zero effect on the load carrying capacity. Download Free PDF. True. 308 0 obj <>stream = 15 lifts 5) 15 ifts 2 (one test every other lift) = 7.5, round up to 8 tests in the top 5 ft. of backfill 6) Total tests required = (Number of test below 5 ft.) + (Number of test above 5 ft.) 7) = 11 tests required (minimum) NOTE: Compaction Tests are required on stone backfill (Class I backfill and bedding material); consult the District Materials Division for Maximum Dry Density and Optimum Moisture Content targets for the specific material being used. 10) What is the maximum backfill lift thickness? SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Silt Tight: A joint that is resistant to infiltration of particles that are smaller than particles passing the No. lift) = 13 tests required (minimum) (Answer) Backfill around Manholes (minimum) One test every fourth compacted lift around the perimeter; beginning after the first 4 inch compacted lift above the bedding and continue to 5 feet below the top of the structure. endobj CADD Manual. This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. The moisture content at which a soil can be compacted to its maximum dry density with the least amount of comparative effort is called the optimum moisture content. Identify typical construction, 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. 8 in. What is the moisture content at which soil can be compacted to its maximum dry density with the least amount of comparative effort called? The requirements for pipe material and installation in sewer and drainage collection systems. Soil compaction occurs when soil particles are pressed together, reducing pore space between them (Figure 1). Students must bring valid ID & attend class in order to test. 2016v1.0 Chapter 4 17, 18 8) At the end of the run ( feet) a 45 degree elbow is used to connect the longitudinal pipe to the non perforated outlet pipe to force the collected water to discharge. The camera must have the means to measure deformation/deflection of the pipe. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. Upstream or down stream? This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. <>/Metadata 1689 0 R/ViewerPreferences 1690 0 R>> Clearly the pipe needs to function as a conduit, as the whole idea of a pipe is to move liquid in a controlled manner and direction. Materials Notebook Resource Document (pdf 2 MB) March 16, 2015. It is placed in 6 loose lifts and compacted to 4. The behavior of a material where the material deforms under load and does not go back to its original shape is called plasticity. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for, CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL, Session 7: Retrofitted Edge Drains 7.1 Learning Outcomes 1. Web Policy / Privacy Statement / WAI Compliance / Email Safety / Site Map, APD Instructional and Informational Memoranda, Minimum Requirements for Quality Assurance and Quality Control on Design Build and P3 Projects, AASHTOWare Project Preconstruction (AWP-P) Manual, Construction Instructional and Informational Memoranda, Instructional and Informational Memoranda, Alternative Intersection Informational Design Guides, LD Instructional and Informational Memoranda, PMO Instructional and Informational Memoranda, Pollution Prevention Field Guide for Construction Activities, Roadside Development Report Excel spreadsheet tool, Nutrient Management Plan for Construction Projects, Nutrient Management Plan for Roadside Management, VDOT BMP Maintenance Manual Appendix C - Plant Palette Tables, Materials Certification School Information, Guide to the Traffic Impact Analysis Regulations, Land Development Inspection Documentation Best Practices Manual, OD Instructional and Informational Memoranda, Guide Manual for Causes and Repair of Cracks in Bridge Deck, Traffic Calming Guide for Neighborhood Streets, Manual on Uniform Traffic Control Devices (MUTCD), TED Instructional and Informational Memoranda, VDOT Traffic Operations and Safety Analysis Manual (TOSAM), Instructional and informational memoranda, Manual for the Procurement and Management of Professional Services. 5) Open only as much trench as can be safely maintained by available equipment. This prevents disruption of the backfill envelope when removing the shoring or trench box. (test every other 4 in. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal, SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. SUBDRAINS AND FOOTING DRAIN COLLECTORS. %%EOF Larry Ritchie, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction), Table 4.9 Storm Drain Inlet Protetion Applicable for, INSTALLATION GUIDE. Care must be exercised to ensure placement and compaction of the embedment material in the haunches. Students must bring valid ID & attend class in order to test. 57 stone can be used as a backfill in the sub foundation. If the inspection is to be conducted with a video camera, the video camera shall have fully articulating lenses that will provide a 360 degree inspection of the pipe/culvert, including each joint and any deficient areas of the pipe/culvert, as well as a means to measure deformations/deflections of the pipe (items such as a laser range finder or other appropriate device for taking such measurements as specified herein and approved by the Engineer). Community College Workforce Alliance | The Mission of CCWA is to meet . <> 6.2 PIPE PVC gravity sewer pipe and fittings, SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General 1 1.01 Work Included 1 1.02 Related Requirements 1 1.03 Reference Standards 1 1.04 Quality Assurance 1 1.05 Measurement And. What is the behavior of a material where the material deforms under load and does not return to its original shape called? VDOT Soils and Aggregate Compaction 2016v1.0 Appendix E | 9 We developed this course with the input of 30-year inspection managers, engineers, and other industry experts. Applications for a zoning district map amendment (rezoning), conditional rezoning, planned development, or conditional use permit shall include a VDOT traffic impact statement (VTIS), and applications for a site plan or preliminary plat shall include a traffic impact statement (TIS), where the proposed development is reasonably anticipated to . TThe Construction Materials Testing Soils exam is delivered on a computer at Pearson Vue Testing Centers. If performed improperly, soil density settlement of the soil could occur and result in unnecessary maintenance costs or structure failure. The exploration should extend to a depth equal to per foot of fill height or 8, whichever is greater. suzanna_gevorgyan. VDOT: Soils and Aggregate Compaction. Conform to requirements of Section 01 33 00 Submittals. For information on the VECAT program, contact Caroline Fahed, 804-288-3169. # u VDOT: Soils and Aggregate Compaction. Similarly, VDOT will recognize NICET Construction Materials Testing Level II Certification in Concrete. Traffic information for existing VDOT maintained roadways can be obtained at the following internet protection. When moving concrete pipe you should pick it up by one end. What term refers to the texture and firmness of a soil? A copy of the Storm Sewer/Culvert Inspection Report (inspection report)including any video tape/digital Video Recording (DVD)/digital photographs shall be provided to the VDOT Inspector within two business days of the completion of the inspection and made part of the project records. 129 0 obj <> endobj This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. 13) Use vibratory plate with a welded foot to compact the aggregate backfill. 0 What are those two functions? Soils will not need to obtain a VDOT Soils and Aggregate Compaction Certification. xZKs2>Ip P7[Sq9FoLLmJgl~K"5JtB2+!765nt-8\Gf._o{}E The contractor shall be responsible for repairing any damages, Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the, SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing, SECTION 200: STORM SEWER CONSTRUCTION STANDARDS Page No. If the inspection is conducted manually, the person performing the inspection may use a standard video camera or a digital camera to document any observed deficiencies. A. Silts and clays are made of particles that are smaller than which sieve? Confined O Ring: The first rubber gasket joint design established by the industry. If you are currently participating in VDOT's Materials Certification Schools, you can access your Materials CertificationReports via the VDOT University Virtual Campus: VDOT University Virtual Campus Users connect at: https://VirtualCampus.VDOT.Virginia.gov . SECTION 02612 NONREINFORCED CONCRETE SEWER PIPE, Division 2 Section 32 14 13.19 Section 02795. in the field: the soil moisture is near the liquid limit. + (12 in. bc the dense gradation provides more strength by filling voids. The proctored 1 hour, 1-on-1 proficiency test is required to fully complete the VDOT Soils & Aggregate Compaction certification. PurRoses 1. This site uses cookies to enhance site navigation and personalize your experience. At the engineer of record's. General: Submit the following in accordance with The General Conditions. SCOPE. VDOT Soils and Aggregate Compaction 2016v1.0 Chapter 1 | 1 2016v1.0 Chapter 4 16, 17 PAVEMENT DRAINS Pavement subsurface drainage is essential in obtaining a well performing pavement, whether it is flexible, rigid or composite. Walls that carry extra, TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines, SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. When planning a pipeline installation, there are 2 key functions that we must design the pipeline to provide. Table of Contents I. Iowa DOT Information a. Screen the sample over a 3/4-inch sieve and replace the aggregate retained with an equal weight of No. Other sets by this creator. Contractor shall ensure that all permits are obtained prior to any construction. + (12 in. If the soils is 100 percent saturated and the voids are full of water and has a high MC. VDOT Soils and Aggregate Compaction: Chapter 3. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including, BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. Fully insert pipe. stiffness 35 psi) is the collecting conduit 4) Aggregate backfill (#8 or #57) 5) Non perforated smooth wall outlet pipe (min. The top few inches should be slightly yielding (loose) and fill the corrugations. 1 (do not test 1st lift) = 2) = 14 tests required per 300 (Answer) Pipe Testing Frequency Example 2: Pipe Diameter = 36 in. americanwick.com 800.242.WICK (9425). Some links may require the Adobe Reader. Additionally, a copy shall be furnished to local VDOT Asset Management personnel to document the pipe/culvert condition at that point in time. 794 (d), please call 800-367-7623. Conditions of Use Type of Inlet Protection, INSTALLATION GUIDE americanwick.com 800.242.WICK (9425) American Wick Drain SITEDRAIN prefabricated drainage products may be installed in a variety of civil construction applications including: retaining. CULVERTS AND BRIDGES 7-5 7.7. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4, VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post, 601.1 601.2(a) SECTION 600 INCIDENTAL CONSTRUCTION SECTION 601 PIPE CULVERTS 601.1 DESCRIPTION This work is construction or reconstruction, inspection, and cleaning of pipe culverts; including subsurface, Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts, STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. B. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily, 155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS, SECTION 9 SEWER/DRAINAGE LINES 9.1 GENERAL This section covers the requirements for piping materials and installation in the Cedar Hills City sewer and drainage collection system. MANHOLES 7-4 7.5. Geotechnical Design Parameters for Retaining Walls, Sound Barrier Walls and Non-Critical Slopes. Culvert Profile. Fill out, edit & sign PDFs on your mobile, Description of vdot soils and aggregate compaction, Related Forms The mandrel shall be fabricated of metal, fitted with pulling rings at each end, stamped or engraved on some segment other than a runner with the nominal pipe/culvert size and mandrel outside diameter. Length of run = 856 ft. (Pipe Diameter lift thickness) + (Fill above pipe lift thickness) (1 lift) = 3) (36 in. The video tape/dvd/digital photographs should be of such clarity, detail and resolution as to clearly show the conditions of the interior of the pipe/culvert and detect any defects within the pipe or culvert as specified herein. The above components are designed to perform three functions to aid in draining water from the pavement; these are: Intercept Collect Discharge Following is a general guide on the installation of underdrain/edge drain systems: 1) Excavate trench making sure the side walls are stable 2) Remove any sloughed materials from the trench 3) The dug out material is picked up with conveyor belt and loaded in trucks or piled on one side then picked up by a front end loader. The pipe should be stacked and chocked to avoid movement of the pipe. Backfill material shall be knifed into the area along the bottom edge of the pipe. %PDF-1.4 19 terms. The loosely placed center section of the bedding allows the pipe to seat itself and helps minimize point loads. The inspection can be conducted manually if adequate crawl/walking space and ventilation is available to safely conduct the inspection and the individual(s) conducting the inspection have undergone training on working in confined spaces in accordance with VDOT s current Safety Policy and Procedure #8 Confined Space Entry Policy and Procedure General, or the inspection can be conducted with a video camera. If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. June 21st, 2018 - 2018 Soil Classification and Compaction Proficiency Samples 177 according to the AASHTO or the data sheet Shrinkage Factors of Soils by the . A drained pavement structure has a higher bearing capacity that can effectively support traffic loadings, and lead to long lasting pavement at the least maintenance cost. Once a soil or aggregate mixture has been placed in a layer on the embankment, the contractor can use various types of compaction equipment to densify the soil to the desired level of compaction. Single Offset: This joint first appeared in the early 1990 s. This style of spigot is much easier to manufacture. Try Now! These heavy loads can cause considerable damage in flexible pipes and can cause D load cracking in rigid pipes. Description. Suggested participants would include contractor and supplier quality control personnel, consultants, testing firms and agency . Exams are offered at various locations in Virginia. Generally excavated embankment material is used as the final backfill. hb```f````2X@( [ $ VDOTSoilsandAggregateCompaction 6 FIELDMOISTUREANDDENSITYTESTING WITHTHENUCLEARGAUGE LEARNINGOUTCOMES . We also encourage you to contactJ. R. Noble at james.noble@vdot.virginia.gov to sign up for the MCS Managers report, which is offered to help you better track and manage progress throughout the year. What is compaction? 4 in.) Trenching should be completed in existing soils with sidewalls reasonably vertical to the top of the pipe. This section covers excavation and trenching work and shall include the necessary clearing, grubbing, and preparation, BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. 1. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or, Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. (500 grams) of soil. - 2000, If you believe that this page should be taken down, please follow our DMCA take down process, Something went wrong! For assistance printing or verifying your Materials Certifications Report use this click here. Verifying that the correct pipe has been delivered for the applications on your project. SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Your one-stop source for VDOT maps, data and project info. 2 0 obj A standard Video/ Digital Camera can be used. For flexible pipe this begins 12 over top of pipe for smaller pipe and 18 for pipe 54 and larger. 17) What is the minimum amount of cover over pipe allowed for design loads? In the top 5 feet; perform one test every other lift around the perimeter and continue to the top of the structure. American Water Works Association Trenching, Backfilling and Compacting: 02223, DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H, City of West Linn Public Works Standard Construction Specifications. SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard, LS 2540 SEWER LATERALS AND INSPECTION TEES A. %PDF-1.5 % Rubber gaskets may be used when the joint slope is five degrees or less, however it is usually limited to mastic or butyl sealants.

Spiritual Retreats Hawaii, High Tea Yeppoon, Articles V